Business

Hongseong can solve your lightweight requirements in various business sectors!

Gwanggaeto Frigate, Korea
최고관리자 2023-01-05
  Project Gwanggaeto Daewang FFG   Year of Completion  2021
  Application CIC room   Operation Korean Sea
  Shipyard DSME hull no 7321   Material DeckDyne HH-200


    

Gwanggaeto Daewang destroyer (DDH-971)   



The Gwanggaeto the Great Class(DDH-971) destroyers were built by Daewoo Shipbuilding and Marine Engineering (DSME).   KDX-I has an overall length of 135.5m, beam of 14.2m and a draft of 4.2m. The full load displacement of the ship is 3885 to 3900 tons. 


The average life cycle of naval vessel is up to 30 years. In 2020, DDH-971 has operated for 25 years and the project to extend the lifesapn was carried out. The KDX-I performance improvement project was to improve the performance of the aging combat system and sensors of the Korean destroyer.   


Through the project, it has been able to reduce the operational crew, and has secured an additional operating capacity of 10 years. 


Hivetecks honeycomb panel were installed in marine access raised floor systems with turnkey supply in this project. For the installation of floor panel in CIC(Combat Information Center) room, lightweight and anti-static feature were the vital elements.  DeckDyne series floor false decking system panel meet the requirements and are used in various marine projects.



 b32712bbba96c6cb58dd63ccbe3d9537_1672908887_5914.png   b32712bbba96c6cb58dd63ccbe3d9537_1672908890_0577.png