Project | Completion | ||||||||
E-mart Headquarter | 1999 | ||||||||
Location | Material | ||||||||
Seongdong, Seoul | HivetecksⓇ 4mm metalic gold 16,000㎡ |
Project | Completion | ||||||||
E-mart Headquarter | 1999 | ||||||||
Location | Material | ||||||||
Seongdong, Seoul | HivetecksⓇ 4mm metalic gold 16,000㎡ |
Hivetecks in E-mart Headquarter, representing Seongsu-dong
The headquarters of E-Mart in Seongsu-dong, embodies the motif of the corporate spirit in their office building; which is to put customers first. The vertical linear design symbolizes the company's dynamism and growth.
A stripe design was adopted for the continuity and flow of faces to ensure continuity of forelimbs and high-rise mass. It was established on an atypical site with a trapezoidal shape with a wide front and a narrow rear.
The central core was used to minimize the side where the workspace faces the outer wall. Due to the oblique restriction, the rooftop part is used as a sky garden, and the front part of the 14th floor above the ground is composed of a two-story rest area, which is used as a space for workers' leisure and relaxation.
The headquarter of E-Mart, a representative building in Seongsu-dong with a modern design, used Hivetecks® from Hongseong Industrial Co.
Hongseong's Honeycomb Panel has the advantage of excellent quality and compliance with delivery dates by producing it in a continuous line. In addition, it is an item suitable for both interior and exterior materials of buildings that require light weight and flattness.